< BACK TO PROJECTS

Grange Park Primary School
Enfield, London

Eco Modular Buildings were delighted to partner Kier in the design and construction of this outstanding two storey educational building for the London Borough of Enfield during 2014. The Building comprises of 8 classrooms and 2 grouprooms
over 2 floors.
It has fully tiled toilets on each floor fitted out with Armitage Venesta toilet cubicle and vanity units.
The Building boasts the highest of specification and finishes. Oak skirting boards and architraves to complement the
Leaderflush sentinel doors, glazed staircases, 8 person lift & over 300sqm of solar PV to name a few.
Externally the ground floor was wrapped in a traditional brick skin and to first a Trespa rain screen cladding.

We designed the building to meet the new TM52 Facilities Output Specification and advanced ventilation criteria and worked with Breathing Buildings to ensure that the Thermal Model met with night time cooling, prevention of summer over-heating and allowed cost effective winter heating. The Breathing Buildings ventilation system was assisted by the use of Armstrong Coolzone Phase Change Material in the suspended ceilings within the teaching areas.

Eco Modular Buildings manufactured the building within 12 weeks then installed and commissioned the building during
a 8 week site programme. Grange Park Primary School gave us the footing to become the 1st modular building supplier to
meet all EFA regulations and requirements.

Building size
1002sqm

Building Size

Manufacturing period
10 weeks

Manufacture

Installation time
9 weeks

Installation

01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 |